Cost for new Electricity connection, Construction of Line, Post Insertion, Conversion of connection, Enhancement of connected load, Adding conductor, Conversion of Line, Re-conductoring, Installation of Transformer & RMU - KSEB, kerala

SI  No.

Description of the work

KSERC
Approved Rate (Rs)

1

LT single phase weather proof service connection upto and including 5kW

1700

2

LT three phase weather proof service connection up to and including 10 KW

4200

3

LT three phase weather proof service connection above 10kW upto and including 25kW

14300

4

LT three phase weather proof service connection above 25kW & below 50kVA

21200

5

LT three phase weather proof service connection from 50kVA and above upto and including 100kVA .

23600

6

Providing support pole for weather proof service connection.

4800

7

LT single phase over head service connection upto and including 50m with max. 1 Post

8000 + 62 per M of OH Line

8

LT single phase over head service connection above 50 m upto and including 100 m with max. 2 Posts

18600 + 62 per M of
OH Line above 50M

9

LT single phase over head service connection above 100m up to and including 150m with max. 3 Posts

28950 + 62 per M of
OH Line above 100M

10

LT single phase over head service connection above 150m up to and including 200m with max. 4 Posts

39150 + 62 per M of
OH Line above 150M

11

LT three phase over head service connection upto and including 50m with max. 1 Post

10950 + 182 per M of OH Line

12

LT three phase over head service connection above 50m upto and including 100m with max. 2 Posts

28650 + 182 per M of OH Line above 50M

13

LT three phase over head service connection above 100m up to and including 150m with max. 3 Posts

46800 + 182 per M of OH Line above 100M

14

LT three phase over head service connection above 150m up to and including 200m with max. 4 Posts

64800 + 182 per M of OH Line above 150M

15

Post insertion for LT single phase over head line  (without stay)

5650

16

Post insertion for LT single phase over head line (with stay)

7050

17

Post insertion for LT single phase over head line (with strut)

11200

18

Post insertion for LT three phase over head line (without stay)

7250

19

Post insertion for LT three phase over head line (with stay)

8650

20

Post insertion for LT three phase over head line (with strut)

13050

21

Conversion of LT single phase weatherproof service connection to LT three phase weather proof service connection with connected load upto and including 10kW

3700

22

Conversion of LT single phase weatherproof service connection to LT three phase weather proof service connection with load above 10 kW up to and including 25kW

13950

23

Conversion of LT single phase weatherproof service connection to LT three phase weather proof service connection with load above 25kW and below 50kVA

20250

 

24

Conversion of LT single phase weatherproof service connection to LT three phase weather proof service connection with load 50kVA and above up to and including
100kVA

 

22650

25

Enhancement of connected load of LT three phase weather proof service connection with a maximum load of 10kW into the range of 10 kW - 25 kW.

13300

26

Enhancement of connected load of LT three phase weather proof service connection with a maximum load of  10kW into the range of >25 kW and less than 50 kVA.

20150

27

Enhancement of connected load of LT three phase weather proof service connection with a maximum load of 10kW into the range of 50 kVA - 100 kVA.

23550

28

Enhancement of connected load of LT three phase weather proof service connection with a connected load >10 kW - 25 kW in to the range of >25 kW and less than 50 kVA.

18150

29

Enhancement of connected load of LT three phase weather proof service connection from the range of   10 kW - 25 kW in to the range of 50 kVA – 100 kVA.

20850

30

Enhancement of connected load of LT three phase weather proof service connection from the range of 25 kW  to 50 kVA in to the range of 50 kVA – 100 kVA .

18500

31

Shifting Single Phase meter

550

32

Shifting 3 phase meter

700

33

Shifting  3 phase CT meter

1250

34

HT post insertion in HT/LT line (with stay)

14400

35

HT post insertion in HT/LT line (with strut)

16550

36

Providing strut using LT pole

6150

37

Providing strut for using HT pole

8350

38

Providing LT stay

1650

39

Providing HT stay

2200

40

Reconductoring  1 conductor per metre of LT line with ACSR  Rabbit

60

41

Reconductoring  1 conductor per metre of LT line with ACSR  Weasel

40

42

Reconductoring  per metre HT line with ACSR  Raccoon

275

43

Reconductoring  per metre HT line with ACSR  Rabbit

190

44

Adding one conductor (ACSR Rabbit) per metre on the existing poles (where cross arm is available) inclusive of cost of pin,insulator  etc.

90

45

Adding one conductor (ACSR Rabbit) per metre on the existing poles (where cross arm is not available) inclusive of cost of pin, insulator  etc.

105

46

Adding one conductor per metre of ACSR Weasel on the existing poles (where cross arm is available) inclusive of cost of pin, insulator etc.

70

47

Adding one conductor per metre ofACSR Weasel on the existing poles (where cross arm is not available) inclusive of cost ofpin,insulator etc.

85

48

Conversion of LT single phase 2 wire line to LT Three phase 4 wire line per metre

180

49

Conversion of LT single phase 2 wire line to LT Three phase 5 wire line per metre

220

50

Conversion of LT single phase 3 wire line to LT Three phase 5 wire line per metre

180

51

Drawing Single Phase 2 wire line per metre  under existing HT line

150

52

Drawing Single Phase 3 wire line per metre  under existing HT line

205

53

Drawing Three Phase 4 wire line per metre under existing HT line

265

54

Drawing Three Phase 5 wire line per metre  under existing HT line

315

55

Construction of LT single phase, 2 wire line per metre

345

56

Construction of LT single phase, 3 wire line per metre

390

57

Construction of LT 3 phase, 4 wire line per metre

460

58

Construction of LT  3 phase, 5 wire line per metre

510

59

Construction of 11KV line per metre  using  ACSR RABBIT using PSC Poles

580

60

Construction of 11KV line  per metre  using ACSR RACOON using PSC Poles

660

61

Laying of  HT XLPE UG Cable per metre
(3x300 mm2 single run)

2000

62

Construction of 11KV line per metre using ACSR Racoon with A Pole (with out tree cutting compensation )

945

63

Construction of 11KV line per metre using ACSR Racoon with 4 Leg (with out provision for tree cutting compensation )

1900

64

Installation of  11 kV/ 433 V , 25 kVA Transformer

202500

65

Installation of 11 kV/ 433 V , 100 kVA Transformer

298450

66

Installation of  11 kV/ 433 V , 160 kVA Transformer.

426100

67

Installation of  11 kV/ 433 V,  250 kVA Transformer.

453600

68

Installation of 11 kV/ 433 V , 500 kVA Transformer.

772850

69

Installation of Data Acquisition compatible, extensible type Ring Main Unit without VCB- CCC (E)  (Cable -Cable - Cable)

423600

70

Installation of  DA compatible, extensible type Ring Main Unit without VCB-CTC (E) (Cable -Transformer -Cable )

480150

71

Installation of Data Acquisition compatible, extensible type add- on type Ring Main Unit without VCB (Single Switch C-Extn.)

364450

72

Installation of Data Acquisition compatible, extensible type add- on type Ring Main Unit with VCB (Single Switch T-Extn.)

436850

73

Installation of Data Acquisition compatible, extensible type Ring Main Unit with provision for isolation and earthing facility on both sides (GCG)

335650




Views: 394.