SI No. |
Description of the work |
Rate approved by KSERC in Rupees |
1 |
LT single phase weather proof service connection upto and including 5kW ( using static meter with LCD facility) |
1740.00 |
2 |
LT three phase weather proof service connection up to and including 10 KW ( using static meter with LCD display and TOD facility) |
4220.00 |
3 |
LT three phase weather proof service connection above 10kW upto and including 25kW ( using static meter with LCD display and TOD facility) |
14420.00 |
4 |
LT three phase weather proof service connection above 25kW& below 50kVA |
21750.00 |
5 |
LT three phase weather proof service connection from 50kVA and above upto and including 100kVA . |
23000.00 |
6 |
providing support pole for weather proof service connection. |
5540.00 |
7 |
LT single phase over head service connection upto and including 50m with max. 1 Post |
9160+80per M of OH line |
8 |
LT single phase over head service connection above 50 m upto and including 100 m with max. 2 Posts |
21950+80 per M of OH line above 50m |
9 |
LT single phase over head service connection above 100m up to and including 150m with max. 3 Posts |
34450+80 per M of OH line above 100m |
10 |
LT single phase over head service connection above 150m up to and including 200m with max. 4 Posts |
46750+80 per M of OH line above150m |
11 |
LT three phase over head service connection upto and including 50m with max. 1 Post |
11550+160 per M of OH line |
12 |
LT three phase over head service connection above 50m upto and including 100m with max. 2 Posts |
28880+160 per M of OH lineabove 50m |
13 |
LT three phase over head service connection above 100m up to and including 150m with max. 3 Posts |
46600+160 per M of OH line above 100m |
14 |
LT three phase over head service connection above 150m up to and including 200m with max. 4 Posts |
64100+160 per M of OH line above1 50m |
15 |
Post insertion for LT single phase over head line (without stay) |
6700 |
16 |
Post insertion for LT single phase over head line (with stay) |
8170 |
17 |
Post insertion for LT single phase over head line (with strut) |
13200 |
18 |
Post insertion for LT three phase over head line (without stay) |
7730 |
19 |
Post insertion for LT three phase over head line (with stay) |
9200 |
20 |
Post insertion for LT three phase over head line (with strut) |
13850 |
21 |
Conversion of LT single phase weatherproof service connection to LT three phase weather proof service connection with connected load upto and including 10kW |
4170 |
22 |
Conversion of LT single phase weatherproof service connection to LT three phase weather proof service connection with load above 10 kW up to and including 25kW |
15450 |
23 |
Conversion of LT single phase weatherproof service connection to LT three phase weather proof service connection with load above 25kW and below 50kVA |
22800 |
24 |
Conversion of LT single phase weatherproof service connection to LT three phase weather proof service connection with load 50kVA and above up to and including 100kVA |
23800 |
25 |
Enhancement of connected load of LT three phase weather proof service connection with a max. load of 10kW into the range of 10 kW to 25 kW. |
14550 |
26 |
Enhancement of connected load of LT three phase weather proof service connection with a maximum connected load of 10 kW into the range of 25 kW to 50 kVA. |
22550 |
27 |
Enhancement of connected load of LT three phase service connection with a maximum connected load of 10 kW into the range of 50 kVA to 100 kVA . |
24550 |
28 |
Enhancement of connected load of LT three phase service connection with load in the range of 10kW - 25 kW into the range 25 kW - 50kVA |
21210 |
29 |
Enhancement of connected load of LT three Phase service connection with load in the range of 10kW - 25 kW into the range of 50 kVA -100 kVA |
22510 |
30 |
Enhancement of connected load of LT three Phase service connection with load in the range of 25kW - 50 kVA into the range of 50 kVA -100 kVA |
19510 |
31 |
Shifting Single Phase Energy Meters |
610 |
32 |
Shifting Three Phase EnergyMeters |
800 |
33 |
Shifting Three Phase CT Meters |
1400 |
34 |
HT pole insertion in HT/LT line (with stay ) |
15870 |
35 |
HT pole insertion in HT/LT line (with strut using 8m pole ) |
17850 |
36 |
Providing strut using LT pole |
6500 |
37 |
Providing strut using HT pole |
9100 |
38 |
Providing LT stay |
1750 |
39 |
Providing HT stay |
2310 |
40 |
Recondutoring LT line ,with Rabbit 1 conductor |
55 |
41 |
Recondutoring HT line ,with Raccoon |
240 |
42 |
Recondutoring HT line ,with Rabbit |
170 |
43 |
Adding one conductor (ACSR Rabbit) on the existing poles (where cross arm is available) inclusive of cost of pin,insulator etc. |
85 |
44 |
Adding one conductor (ACSR Rabbit) on the existing poles (where cross arm is not available) inclusive of cost of pin, insulator etc. |
100 |
45 |
Conversion of LT single phase 2 wire line to LT Three phase 4 wire line (per metre) |
165 |
46 |
Conversion of LT single phase 2 wire line to LT Three phase 5 wire line |
215 |
47 |
Conversion of LT single phase 3 wire line to LT Three phase 5 wire line |
165 |
48 |
Drawing Single Phase 2 wire line under existing HT line |
130 |
49 |
Drawing Single Phase 3 wire line under existing HT line |
200 |
50 |
Drawing Three Phase 4 wire line under existing HT line |
250 |
51 |
Drawing Three Phase 5 wire line under existing HT line |
310 |
52 |
Construction of LT single phase, 2 wire line |
340 |
53 |
Construction of LT single phase, 3 wire line |
400 |
54 |
Construction of LT 3 phase, 4 wire line |
460 |
55 |
Construction of LT 3 phase, 5 wire line |
520 |
56 |
Construction of 1Km of 11KV line using ACSR Rabbit (with out tree cutting compensation ) |
605 |
57 |
Construction of 1Km of 11KV line using ACSR Racoon (with out tree cutting compensation ) using 24 no of poles and 21nos of stays |
670 |
58 |
Laying 1KM of HT XLPE UG Cable (3x300 mm2 single run) |
1770 |
59 |
Construction of 1 Km of 11KV line using ACSR Racoon with A Pole (with out tree cutting compensation ) |
960 |
60 |
Construction of 1Km of 11KV line using ACSR Racoon with 4 Legged tower (with out provision for tree cutting compensation ) |
1880 |
61 |
Installation of 1 No. 11 KV/ 433 V , 25 KVA Transformer |
282000 |
62 |
Installation of 1 No. 11 KV/ 433 V , 100 KVA Transformer without stay( pole mounted ) |
390000 |
63 |
Installation of 1 No. 11 KV/ 433 V , 160 KVA Transformer without stay (pole mounted) |
547000 |
64 |
Installation of 11KV/433V 250 KVA Transformer without stay |
561000 |
65 |
Installation of 1 No.11 KV/ 433 V , 500 KVA, Transformer |
874000 |
66 |
Installation of Data Acquisition compatible Extensible type Ring
Main Unit without VCB -CCC (E) (Cable -Cable -Cable ) |
425350 |
67 |
Installation of Data Acquisition compatible Extensible type Ring Main Unit with VCB -CTC (E) (Cable -Transformer -Cable ) |
482000 |
68 |
Installation of Data Acquisition compatible Extensible add-on type Ring Main Unit without VCB (Single Switch C-Extension) |
371500 |
69 |
Installation of Data Acquisition compatible, Extensible, add-on type Ring Main Unit with VCB (Single Switch T-Extension) |
443700 |
70 |
Installation of Data Acquisition compatible Extensible type Ring Main Unit with provision for isolation and earthing facility on both sides (GCG) |
338000 |
71 |
Drawing 1Km of 11 kV ABC of size 3X150 + 1X120 sqmm on 9 mts supports with an average span of 20-25 mts |
1340213.03 |
72 |
Ddrawing 1Km of 11 kV ABC of size 3X120 + 1X95 on 9 mts supports with an average span of 20-25 mts |
1197653.03 |
73 |
Drawing 1Km of 11 kV ABC of size 3X95 + 1X70 on 9 mts supports with an average span of 20-25 mts |
1156073.03 |
74 |
Drawing 1Km of LT ABC of size 3X95 + 1X70 +1X16 on 8 mts supports with an average span of 20-25 mts |
883334.27 |
75 |
Ddrawing 1Km of LT ABC of size 3X70 + 1X50 +1X16 on 8 mts supports with an average span of 20-25 mts |
841754.27 |
76 |
Drawing 1Km of LT ABC of size 3X50 + 1X35 +1X16 on 8 mts supports with an average span of 20-25 mts |
794894.27 |